Wednesday, October 6, 2010

PROJECT 7 :: TIMELINES

BRANDING STUDENTS (excluding kibera tv)

mon oct 11: 10 5-frame storyboards due, 1 frame/sec (1280 x 720 proportions). work in small groups (three groups of five) to determine a direction to pursue.

wed oct 13: kinetic type lecture. refined, tight 5-frame color storyboard due.

mon oct 18: semi-final production due.

wed oct 20: logo i.d.s due (no crit)

mon oct 25: artifact decision and content outline due.

wed oct 27: brainstorming results due.

mon nov 1: storyboards due.

wed nov 3: refinements / initial production due.

mon nov 8: semi-final production due. T2 field trip @ 9:30!!

wed nov 10: final crit on both projects
- - - - - - - - - - - - - - - - - - - - - - - - - -

KIBERA BRANDING STUDENTS 

mon oct 11: 10 5-frame storyboards due, determine a consistent frame-rate based on how long your bug is animated, if it is animated. (1 frame/sec or 5 frames/sec, etc) (1280 x 720 proportions). work in small groups (three groups of five) to determine a direction to pursue.

wed oct 13: kinetic type lecture. refined, tight 5-frame color storyboard due.

mon oct 18: semi-final production due.

wed oct 20:  logo bugs due (no crit)

mon oct 25: brainstorming results due on content/story structure for the opener.

wed oct 27: rough storyboards for 3 directions due.

mon nov 1: final refined storyboard / digital work due.

wed nov 3: refinements / initial production due.

mon nov 8: semi-final production due. T2 field trip @ 9:30!!

wed nov 10: final crit on both projects
- - - - - - - - - - - - - - - - - - - - - - - - - -

INFORMATION STUDENTS

mon oct 11: have a project selected and some research / content gathered. share initial ideas in small group discussions.

wed oct 13: kinetic type lecture. finalized content due. brainstorming results due on possible story structures.

mon oct 18: rough storyboards for 3 visual directions due (same basic story structure). determine a direction to pursue.

wed oct 20:  final refined storyboard due.

mon oct 25: initial production due.

wed oct 27: production progress due.

mon nov 1: production progress due.

wed nov 3: semi-final production due.

mon nov 8: near-final production due. T2 field trip @ 9:30!!

wed nov 10: final crit.